Basement Wall Replacement Project
 New Basement Wall Replacement Project Posted 1/24/11 ( click here)
Additional YouTube Videos

|
|
Fortress carbon fiber is now a proven popular alternative to steel beams for reinforcing structural substrates in residential and commercial applications. It is superior to steel being stronger, stiffer, more compact and non corrosive with its patented blend of carbon fiber and Kevlar. It easily conforms to bowed walls and its carbon grid is fully encapsulated in epoxy for the best possible wall adhesion.
Fortress CFRP advantages:
- Installs quickly. Most installations are completed in one or two days
- No excavation in most cases
- No wall drilling or holes to break open
- No service required after installation
- Thin as a dime and hardly noticable after wall is painted
- Ten times stronger than steel beams in tension. See the Structural Integrity video on the home page
- Your wall can be painted after 24 hours
- Competitive pricing / certified installer
- Double Lifetime transferable guarantee
- Best repair for aesthetics and home resale
- No noxious fumes during installation
Fortress CFRP disadvantages:
- First day of wall preparation is somewhat noisy
- Sometimes a small amount of dust is generated when wall scarification is required, although EBR now utilizes Bosch HEPA vacuums for the scarification process
- Wall mounted horizontal obstacles must be moved off the wall
- Wall painting not included
- CFRP is not designed to address foundation settlement and settlement cracks
- Wall must be somewhat dry for installation
What to expect when installing Fortress carbon fiber:
- You will need to clear a 5'-6' space from the wall and remove any cabinets or shelving.
- EBR will move and reinstall your washer and dryer if required
- EBR will not move any fixed showers or wall coverings such as drywall unless contracted
- EBR will require power, heat and lighting in the repair area
- EBR will put down a drop cloth from the main door into the basement
- Normal starting time is between 8-9 am and finish by 3:30-4:00 pm
- Normal installation will require one or two days back to back
- Smaller jobs ( less than 10 locations ) often will be completed before 2 pm
- There will be no toxic or unpleasant fumes generated during installation
- All cracks on the stabilized walls will be cleaned out tuck pointedÂ
- EBR will broom clean the repair area when done
|
|
Luxury Home Stabilization Project
 New Basement Wall Stabilization Project Posted 4/4/11 ( click here)
See Carbon Fiber Structural Integrity Video( Click Here)
See this site for more advice on cracked and bowing walls. ( Click Here)
|